Plumbing truck stock used but not billed: the 30-minute van check

Plumbing truck stock used but not billed is the gap between the parts a service van goes through and the parts that reach that van’s tickets — and it rarely looks like a loss, because the van gets restocked either way. The cost lands in the month’s materials, not on any job, so job margins look better than they were and nobody can say which calls gave the parts away. This guide shows a 30-minute check that needs no inventory software: one van, one month of supply-house orders, set against the parts billed on that van’s tickets. Then it sets out the single rule on site that keeps the count honest, and says when the gap is too small to chase.

By , founder of Lumina Business Advisory · Updated · Sources checked · Editorial standards

Why truck stock used but not billed hides in plain sight

Free self-check · two taps · no email

Hand-off 4 of 6 · Delivery → Invoice

How many days pass, typically, between finishing work and sending the invoice?

Choose the answer that sounds like your business.

Answer it in the Self-Audit

A service van is a small warehouse that refills itself. Parts go out on calls, the tech or the shop restocks from the supply house, and the van looks full again on Monday. Nothing in that loop asks whether every part that left the van also reached a ticket.

So the gap does not show up as a loss. It shows up in two quieter places: in the materials line of the monthly books, which runs a little higher than the jobs explain, and in job costing, where every job that gave a part away looks more profitable than it was. The owner sees a decent margin on each job and a thinner month, and the two never quite reconcile.

Field-service software does not close this by itself. ServiceTitan’s help center describes its truck replenishment as working from invoices: as technicians use materials on invoices, the items appear on a Materials Used list, and the same page says the software does not track on-hand inventory on the truck in real time. Follow that design one step further and a part used on site but never added to an invoice never reaches the list. The van still gets refilled — by a counter run on the company account, a standing order or a trip to the shop shelf — and the cost arrives with no job attached.

How parts fall off the ticket

The gap has a handful of ordinary causes. None of them needs a dishonest tech; each one is a missing step between the van and the invoice.

  • The extra fitting. A flat-rate task carries a standard material list. The job needed two more couplings, a longer supply line or a second shutoff, and the task price stayed the same.
  • The “while I’m here” fix. The tech swaps a weeping angle stop next to the faucet being replaced, the customer is grateful, and nothing goes on the ticket because nobody asked for it.
  • The counter purchase. A part picked up on the way to the job, on the company account, with no job number on the counter ticket. The supply-house invoice exists; the link to the job does not.
  • The end-of-day ticket. Materials are typed in from memory after the last call, and the small parts drop out first.
  • The return trip. Parts used on a callback, recall or warranty visit that nobody records, so the first job’s real cost stays understated.
  • The swap. The part on the ticket is not the part installed — a different valve, a longer water-heater connector — and the price never changed.

Because every cause is a missing step, the fix is a step, not a lecture. That matters for how the owner talks about the finding with the team.

Margin, not theft: why the framing matters

When parts go missing, the first thought can be theft. Sometimes it is, and a reconciliation will show a pattern that no ordinary job explains. But treating the whole gap as theft turns a paperwork problem into a trust problem, and the techs who simply forget the second coupling stop volunteering what they used.

The more useful frame is job cost. A part used and not billed is a materials cost charged to the wrong place: to the month instead of the job. Once it sits on the job, the owner can see which job types give parts away, which pricebook tasks carry too short a material list, and which habits need work — without accusing anyone.

The paper trail already exists. IRS Publication 583 says supporting documents for inventory should show the amount paid and that the amount was for inventory, and it lists canceled checks, cash register tape receipts, credit card sales slips and invoices as examples. The supply-house invoices for the van are those documents. The check below reads them against the tickets the van produced.

The 30-minute check: one van, one month

Pick one van and one recent month. Choose the van of a tech the owner trusts, so the result reads as a finding about the process rather than a verdict on a person. Then gather two piles and compare them.

  • Every supply-house invoice and counter ticket charged to that van or tech for the month: replenishment orders, will-call pickups and transfers from the shop shelf.
  • Every ticket that van completed in the same month, with the materials billed on each, from the field-service software or the paper copies.
  • A short list of ten to fifteen parts that move fast and cost real money: angle stops, supply lines, wax rings, P-traps, fill valves, faucet cartridges, PEX fittings, ball valves, water-heater connectors.
  • For each part, three numbers: bought for the van, billed on the van’s tickets, and the difference.
  • A set-aside column for what should not be billed part by part: shop supplies such as solder, flux, glue and tape; warranty parts the manufacturer replaces; and stock that built the van up rather than replaced what was used.

The difference column is the finding. A small difference that moves around is noise — a part still in the bin at month end, a part returned for credit. A difference that repeats on the same parts, month after month, is a step missing on site.

What the gap is worth: an illustrative count

Illustrative example: one van, one month. The supply house sold the van 40 angle stops and 28 reached tickets; it sold 30 supply lines and 19 were billed. At hypothetical costs of $15 and $12, those 23 parts come to $312 at cost. Add cartridges, fittings and a ball valve with the same pattern, and the van reaches about $600 at cost for the month. If the shop marks parts up, or prices them inside flat-rate tasks, the price the customer never saw is higher. Six vans with the same pattern would put the same arithmetic near $3,600 at cost a month, before any markup. Every number here is invented to show the method; the shop’s own invoices give the real ones.

The second number matters more than the total: which jobs the missing parts belong to. If they cluster on faucet and toilet calls, the pricebook tasks for those calls may carry too short a material list. If they cluster on one tech, it is a habit. If they cluster on counter runs, the job number is not reaching the supply house. Each answer points to a different owner and a different fix.

One rule on site: parts on the ticket before the customer signs

The fix is a step at the moment of use, not a count at the end of the month. Before the customer signs, the tech checks that every part that left the van is on the ticket, either as its own line or inside a task whose material list matches what was installed. If the task needed more than its list, the extra goes on as an add-on, or the owner decides in writing that it is included.

Three smaller rules hold that one in place:

  • Every counter purchase carries a job number, so the supply-house invoice names the job it belongs to.
  • Every return trip — callback, recall or warranty — records the parts it used against the original job, even when the customer pays nothing.
  • Once a month, one named person repeats the one-van check on a different van, so the count becomes a routine rather than an investigation.

In a flat-rate shop the check also feeds the pricebook. When the same task keeps needing parts its material list does not carry, the task is mispriced, and the fix is a pricebook edit, not another reminder to the tech.

When the truck-stock gap is not worth chasing

An honest check can find nothing. If the difference column is small and does not repeat, the van-to-ticket step is working and the time is better spent elsewhere. A one- or two-van shop where the owner still restocks the trucks personally can run this check in an afternoon with a highlighter; it needs no software and no consultant.

Inventory software helps when the shop wants a running count by van and the techs will record parts on site. It does not help if the step at the customer’s door is still skipped. Buy it after the one-van check shows where the gap is, not before.

Outside help can earn its fee when the truck-stock gap is one of several on the same stretch from finished job to invoice: tickets closed days late, extra work agreed in the driveway, re-clears never charged to the first visit. The Revenue Review takes two weeks: read-only access to the shop’s own field-service records, supply-house statements and books, ending in a written report that puts a monthly dollar figure on each leak it finds, ranks the fixes and lays out a 90-day plan. If the records show nothing worth chasing, the report says so, and the free 20-minute call is the place to ask whether it fits at all.

Before any next step

What should you do next?

Fix it yourselves.
If the cause is clear, it lives inside one process, and one person can own it — take the play from this page and run it. That outcome is fine with us; it is why the play is published in full.
Order one bounded build.
If the fix is known but needs configuration or integration inside your stack — a cadence wired into your own system, an alert, a handoff — scope that one build, with us or with anyone you trust. The six systems we build show what bounded looks like.
Start with the Review.
If the causes are debatable, the problem crosses departments or systems, or the economics are unclear — diagnose before anyone builds. The Revenue Review: $4,500 fixed, two weeks, computed from your own records. Read a sample finding before you decide — free, no email.

Asked right after

How do I track truck stock used on plumbing jobs?
Put the part on the ticket at the moment it is used, before the customer signs, and give every counter purchase a job number. Then once a month compare one van’s supply-house invoices with the parts billed on that van’s tickets. Inventory software can keep a running count, but only if the parts are recorded on site; the monthly one-van check works with paper.
Should plumbers charge for small parts like fittings and supply lines?
That is a pricing decision for the owner. In a flat-rate shop the parts can sit inside the task price, which is fine as long as the task’s material list matches what the job really uses. What leaks is the part nobody decided on: used, not in the task, and not added. Write the rule down and the check can tell the difference.
Is missing truck stock a sign of employee theft?
Sometimes, but a gap is not proof of it. The ordinary causes are missing steps: extra fittings beyond a task’s material list, counter purchases with no job number, parts typed in from memory at the end of the day. Run the one-van check first. A pattern that no ordinary job explains is the time to look closer, with the facts in hand.
How often should a plumbing van be counted?
There is no single right answer, and we know of no primary source that sets one. A monthly check of one van against its tickets, rotating through the fleet, is enough to show whether parts are leaving the van without reaching an invoice. A full physical count of every van is a bigger job that makes sense when the shop wants a running inventory by truck.
Do I need inventory software to stop unbilled parts?
Not to find the gap. The supply-house invoices and the tickets are enough to measure it by hand. Software helps keep a running count once the habit of recording parts on site is in place; it does not create that habit. Measure first, then decide whether the size of the gap justifies the software and the time to run it.

Sources

The next step

Bring us the process that keeps getting stuck.

A 20-minute conversation about the workflow, the teams and the systems involved — and a straight answer on whether The Revenue Review is the right next step. If it is not, we say that on the call.

A real person answers or calls you back the same business day.

Free self-check · 2 taps