What Is a Good Close Rate for a Contractor or Service Business?

A good close rate for a contractor or service business is the company’s own, counted the same way every month and holding or rising against its past quarters without a drop in margin on sold jobs, because as of October 2026 we could find no close-rate figure from a government agency, a university or a named publisher’s survey that shows how it was counted. The fastest way to get it from the company’s own records: export the estimates presented in a quarter that ended at least one normal decision period ago, keep one row per customer and job that a decision-maker saw priced, and divide the rows marked sold by all the rows, once for the whole company and once for each lead source and salesperson. A percentage from anywhere else is comparable only with one counted the same way: a roofer counting storm inspections, an HVAC company counting replacement opportunities, a remodeler counting paid design agreements and a mover counting booked dates can print the same percentage and mean four different things. This guide covers how to calculate the rate and which estimates count, why it means something only by lead source and salesperson, what roofing, HVAC and remodeling rates hide, how a booking rate differs, what moves the number besides price, and what to record each week.

By , founder of Lumina Business Advisory · Updated · Sources checked · Editorial standards

How to calculate a close rate, and which estimates count

Free self-check · two taps · no email

Hand-off 2 of 6 · Quote → Contract

Of the quotes open right now, how many have a follow-up date on somebody’s calendar?

Choose the answer that sounds like your business.

Answer it in the Self-Audit

The formula is short: jobs sold divided by estimates presented, times 100. For example, 40 sold out of 120 presented is a 33 percent close rate. Everything that makes the number useful sits in four definitions. Write them on one page before anyone is judged by the result, and do not change them mid-year without restating the earlier months.

  • Presented. A priced estimate that a decision-maker saw: at the kitchen table, on a video call, or sent and then walked through by phone. A phone ballpark, an inspection with no price, a warranty or callback visit, a job the company chose not to bid and a revised copy of the same estimate do not count.
  • The unit. One opportunity per customer and job, not one per option; three options for one house are one decision. ServiceTitan’s documentation works the same way: a sales opportunity includes every estimate created for that job, and it is won when at least one estimate is sold with a subtotal at or above the sold threshold the company sets for that job type.
  • Sold. Signed, with the deposit the company requires, and past any cancellation window that applies. A sale canceled later is marked canceled, not deleted, so cancellations can be counted too.
  • The window. Count each estimate in the month it was presented, and leave that month open until its normal decision time has passed, such as 30, 60 or 90 days depending on the job. Setting this month’s sales against this month’s estimates mixes in sales from earlier months’ estimates and counts this month’s still-open estimates as unsold.

Run the number twice: by count, and by dollars, which is sold dollars divided by presented dollars. If the count rate holds while the dollar rate falls, the company is winning small jobs and losing large ones, a different problem from losing jobs in general. Where an estimate carries options, pick one rule for its presented dollars, such as the option the salesperson recommended, and keep it.

Why a close rate means something only by lead source and salesperson

A company-wide close rate mixes leads that arrived ready to buy with leads that arrived because someone sold the same request to several companies. A referral from a past customer, a tech-generated lead from a service visit, a web lead, a storm canvass and a bid invitation are different conversations before anyone names a price. When the mix shifts, the company-wide rate moves with no change in how anyone sells.

Illustrative example, with hypothetical numbers: two salespeople each present 40 estimates in a quarter. Rep A’s are 30 referrals, of which 15 sell, and 10 web leads, of which 2 sell: 17 sold, 42.5 percent. Rep B’s are 10 referrals, 6 sold, and 30 web leads, 8 sold: 14 sold, 35 percent. Rep A looks better, yet Rep B is better on both kinds of lead: 60 percent against 50 on referrals, about 27 against 20 on web leads. Whoever handed out the leads decided the ranking.

Small counts add noise of their own. A close rate is a proportion, and the NIST/SEMATECH e-Handbook of Statistical Methods sets out the Wilson method for putting a confidence interval around one. For a hypothetical salesperson who sold 10 of 30 estimates in a month, a 33 percent rate, the 95 percent interval runs from about 19 to 51 percent. A quarter at the same rate, 40 of 120, narrows it to about 26 to 42 percent. A ten-point swing between two months of 30 estimates each can be chance alone.

So compare salespeople only on the same lead source and job type, over at least a quarter. Before ranking anyone, check that every estimate reaches the record: a salesperson who enters an estimate only when the customer says yes prints a high rate on a short list. Match each person’s calendar appointments against the estimates in the system; an appointment with no estimate is either a no-bid with a written reason or a missing record.

What roofing, HVAC replacement and remodeling close rates hide

Each of these trades has its own way of putting the wrong things into the fraction, and each fix is a definition, not a sales script.

  • Roofing: inspections and insurance work. An inspection booked from a door knock after a storm is a different event from a homeowner calling for a replacement price, so count inspections and presented estimates as separate steps. An insurance job can carry two signatures: a contingency agreement before the carrier decides the claim, and a build contract after the carrier approves the scope. Count the build contract as the sale, and keep retail and insurance work in separate rows. In Florida, § 489.147 bars a contractor from offering a gift, cash, a deductible waiver “or any other thing of value” in exchange for an inspection or a roof claim, and lets the homeowner cancel a roof contract within 10 days, or by the official start date if that comes first, when it was signed within 180 days of events covered by the Governor’s state-of-emergency declaration for the area. In those months a signed roof contract is not a sale until that window closes.
  • HVAC replacement: two lead types and a setting. Replacement opportunities come from marketed calls and from technicians on service visits; read them apart. Check the sold threshold on every job type. ServiceTitan’s documentation calls it the dollar amount at which a job counts as sold or converted, suggests at least $1 over the dispatch fee, and says that at $0 every completed job counts as converted. A wrong threshold rewrites the close rate without a single sale changing. And a replacement sold at the kitchen table is a sale made at the home: the FTC’s Cooling-Off Rule, 16 CFR Part 429, lets the buyer cancel a sale of $25 or more made at the residence until midnight of the third business day, and its exclusion for a repair visit the buyer asked for does not reach additional goods or services sold during that visit, other than the parts the repair itself used.
  • Remodeling: two closes and a cancellation window. A design-build remodeler can sell twice, a paid design or preconstruction agreement first and the construction contract after it. Report both rates; a strong first rate with a weak second one means design work is being sold that never becomes a build. Where the contract is signed in the homeowner’s house, the same three-day window applies, so count the sale once the window has closed and record cancellations as cancellations.
  • Every trade: price shoppers. A phone ballpark is not a presented estimate. A full visit with a written price is, and if it is lost on price, the lost-reason field says so. Leaving price shoppers out of the count is a choice to write down, not a way to raise the rate.

This is what the rule texts say; the company’s attorney decides how they apply to its own contracts. Not legal advice.

How a booking rate differs from a close rate: a service call and a moving company

A booking rate and a close rate measure two hand-offs with two owners. A booking rate is inquiries that became a booked appointment or job, divided by the inquiries that could have; it belongs to whoever answers the phone. A close rate is estimates sold divided by estimates presented; it belongs to whoever presents the price. One blended number from first call to signed job cannot tell a phone problem from a selling problem.

On a service call the first number is the CSR booking rate: lead calls that became a booked job, where the software decides which calls count as leads. ServiceTitan’s CSR dashboard documentation, for example, counts an inbound call as a lead when it lasts at least 60 seconds and is not excused, and excuses a call tied to an existing job or given the call reason that marks it as not a service request. Once a technician is in the house, ServiceTitan’s documentation separates two more: a conversion rate for service, maintenance and install jobs whose invoice subtotal meets the sold threshold, and a close rate for sales jobs whose sold estimates meet it. The CSR books, the technician converts, the salesperson closes, and each number has its own owner.

A mover’s booking percentage hides the same split, so count it in two steps: inquiries to estimates, then estimates to booked moves. For an interstate household-goods move, 49 CFR 375.401 requires a written estimate based on a physical survey of the goods, which the individual shipper may waive only in writing, signed before loading, and 49 CFR 375.103 defines that survey as one done on site or virtually, through live or pre-recorded video that shows the goods clearly. So the estimate count is a count of written estimates, surveyed unless the shipper waived it, not of prices quoted on the phone. Mark a move booked when the date is held the way the company requires, such as a deposit or a signed order, record cancellations before move day, and give leads bought from a service that sends the same request to several movers their own row.

What moves a close rate besides price

Price decides some losses, and the lost-reason field shows how many if it is filled in every time. Before changing a price, split sold and unsold estimates on each field below. Each is a date or a yes-or-no already on the estimate record, or one that can be added this week and read after a quarter.

  • Days from inquiry to appointment: same or next day, two to four days, five or more. If the sold share falls as the wait grows, the fix is in scheduling, not in the pitch.
  • Everyone who decides in the room: yes or no. An estimate presented to one of two owners leaves the decision to a conversation the salesperson is not part of.
  • Presented or only sent: walked through in person or on a call, against emailed with no conversation.
  • What the estimate shows: options side by side, and exclusions and allowances in plain words, so the customer can line it up against another bid.
  • The first follow-up: days from presenting to the next touch. An estimate with no second touch has not been lost yet; it has not been worked.
  • The start date offered: for example, a price with a start eight weeks out competes with one that starts next week, so backlog can move the rate without anyone selling differently.
  • Financing, where the company offers it: whether it was presented, and on which estimates.

Read the dollars beside the rate. Sold dollars per presented estimate, the close rate times the average sold job, says more about a salesperson than either number alone: one who closes fewer but larger jobs can bring in more per appointment than one who wins small ones. And a close rate that climbs while gross margin on sold jobs falls can mean the price is doing the selling.

Why published benchmarks do not settle it, and the count that does

An outside close rate can be compared with the company’s own only if both counted the same things the same way. Ask any published figure five questions: what counted as an estimate, every visit or only priced ones presented to a decision-maker; what unit, each option or each customer and job; when a job counted as sold, at signature, at deposit, after a cancellation window or at the start of work; which leads, sources, job types, season and region; and who was counted, a sample drawn to represent a trade or the customers, members or respondents of whoever published it. A figure that cannot answer them cannot be compared with anything.

Even inside one product the words move. ServiceTitan’s documentation defines close rate as closed sales opportunities divided by sales opportunities, while its legacy Technician Close Rate by Job Type report treats a service technician’s converted jobs as that technician’s close rate. The comparison that holds is the company against its own last four quarters, counted the same way, from one row per presented estimate. The salesperson fills in the row at the appointment, in the field-service software, the CRM or a spreadsheet:

  • Customer, job, job type, lead source and salesperson.
  • Inquiry date, appointment date and the date the price was presented.
  • Presented value, by the one rule for options, and whether everyone who decides was in the room.
  • Next follow-up date, and each touch made after presenting.
  • Outcome: sold, with date, value and deposit; lost, with a reason; no decision, with a date to look again; or canceled after signing.

Every Friday the office manager or a sales manager, not the salesperson whose numbers they are, runs three lists: calendar appointments with no estimate row, estimates past their decision window with no outcome, and sales signed this week still inside a cancellation window. Each item gets a name and a date before the meeting ends; the quote line of the Friday Ledger counts the follow-ups that were due and how many happened. The owner reads the close rate once a month by lead source and by salesperson, by count and by dollars, and once a quarter against the last four quarters.

When not to pay anyone for this, and where the Review fits

A company where the owner presents every estimate, knows each open one by name and records every outcome does not need outside help here; the definitions above, a spreadsheet and a Friday check are the whole job. If the rate holds steady by source and the open-estimate list is short and dated, the time is better spent on how many inquiries arrive, or on how fast sold work gets billed.

Where estimates come from several salespeople and several lead sources, and nobody can say how many presented estimates ended with no outcome, the Revenue Review counts this under the Quote → Contract hand-off. From read-only exports of the field-service software or CRM, the calendar and the invoices, it rebuilds presented estimates by lead source and salesperson, lists the ones that ended with no decision recorded, and puts a monthly dollar figure on them where the records support one. It sets no sales targets and trains no salespeople, and the written report is the company’s to keep.

To start smaller, the Revenue Self-Audit asks two questions about this hand-off in two taps. The 20-minute call is free, and it is where we say whether the count above, done in-house, is enough, which may well be the honest answer.

Before any next step

What should you do next?

Fix it yourselves.
If the cause is clear, it lives inside one process, and one person can own it — take the play from this page and run it. That outcome is fine with us; it is why the play is published in full.
Order one bounded build.
If the fix is known but needs configuration or integration inside your stack — a cadence wired into your own system, an alert, a handoff — scope that one build, with us or with anyone you trust. The six systems we build show what bounded looks like.
Start with the Review.
If the causes are debatable, the problem crosses departments or systems, or the economics are unclear — diagnose before anyone builds. The Revenue Review: $4,500 fixed, two weeks, computed from your own records. Read a sample finding before you decide — free, no email.

Asked right after

What is a good close rate for HVAC replacement sales?
No HVAC replacement close rate we could find, from a government agency, a university or a named publisher’s survey, shows how it was counted, so a good one is the company’s own: counted per replacement opportunity rather than per option, with technician-generated and marketed leads read separately, the sold threshold checked on each job type and cancellations recorded, and holding or rising against its own past quarters. To raise it, check the days to the sales visit, whether everyone who decides was home, and the follow-up on open opportunities before touching price. A published percentage can be compared with it only if it was counted the same way.
What close rate should a roofing sales rep have?
No roofing close rate we could find, from a government agency, a university or a named publisher’s survey, shows how it was counted, so set the target from the rate that rep, or the team, has produced on the same lead source over recent quarters, with retail and insurance work counted separately and a sale counted at the signed build contract. Judge a rep on at least a quarter of presented estimates. For example, on 30 estimates a 33 percent rate is consistent with a true rate anywhere from about 19 to 51 percent, by the Wilson interval in the NIST/SEMATECH e-Handbook of Statistical Methods.
What is an average closing percentage for a remodeling contractor?
We could find no published remodeling average that shows its counting method, and the figure depends on which step is counted: every site visit, every presented proposal, or a paid design agreement. Report the company’s own rate at each step it sells, lead to design agreement and design to construction contract, by lead source, and record cancellations inside the three-day window that 16 CFR Part 429 gives buyers on contracts signed in the home.
What is a good proposal win rate?
One counted by proposal and by dollars, with invited, negotiated and open bids in separate rows and no-decisions kept apart from losses, compared with the firm’s own past quarters. For federal architecture and engineering work, federal law (40 U.S.C. 1103 and 1104) has the agency rank at least three firms it judges most highly qualified and then negotiate a fee with the top-ranked one. A firm not ranked first reaches fee talks only if the agency cannot agree on a fee with each firm ranked above it, so a lost pursuit there is a ranking result to read, not a price to cut.
What’s a good booking percentage for a moving company?
One counted in two steps, inquiries to estimates and estimates to booked moves, by lead source, with leads bought from services that send the same request to several movers on their own row and cancellations before move day recorded. The company’s own trend by source is the benchmark; a single inquiry-to-move figure hides whether the leak is at the phone or at the estimate.

Sources

The next step

Bring us the process that keeps getting stuck.