Electrical contractor consulting The extra got built. The T&M tag rode in the truck. We find where the money leaks.
Extras billed months late, pay apps that miss the cutoff, retainage parked behind closeout. The two-week Revenue Review reads your records, quantifies what they support and gives your team a prioritized action plan.
- Fixed fee
- $4,500
- Length
- Two weeks
- Access to records
- Read-only
For electrical contractors at $1M+ a year.
+1 (786) 840-7575Mon–Fri, 9 a.m.–6 p.m. ET · A real person answers or calls you back the same business day.After hours? Book the call online: one form, no calendar
What does an electrical contractor consultant review?
The Review follows extra work from the foreman’s T&M tag through the change order, schedule of values and pay application. It connects those records with job cost and retainage for contractors doing service and GC work. Lien rights and disputed contract terms remain questions for construction counsel.
Sound familiar?
What electrical contractors say about the money they can’t find.
01
Extras built before they’re priced
The super asks the foreman, the crew runs it that day, and the tag waits for a signature. Turning it into a change order that week is nobody’s job.
02
Invoices out late, then chased
The bill waits for the end of the job. Once it goes out, following up on a schedule is nobody’s job, so collecting turns into scrambling.
03
A pay app that misses the cutoff
The percent complete, the new change-order lines and the lien waiver come from three people. When one is late, the pay app rolls a month while payroll runs weekly.
04
Retainage waiting on a binder
The last slice of the contract waits on as-builts, O&M manuals and the final lien waiver. Assembling them after the crew leaves is nobody’s job.
05
No way to tell which jobs paid
Hours get coded to general and material isn’t tied to job numbers, so service and project work share one P&L and fade shows up at closeout.
06
Estimates emailed and never followed up
Service estimates go out by email and wait for a reply. The second call is nobody’s job, and meanwhile the phone keeps ringing with new work.
Paraphrased from what owners in this trade say in public — podcasts, interviews, trade press and forums — not from our clients.
None of this is fixed by bringing in more business. Each leak sits in work already on the books.
Where it stalls
From the first call to the cleared payment: where the money stalls.
- Call
- Hand-off 01 to Bid
- Hand-off 02 to Contract
- Hand-off 03 to Job
- Hand-off 04 to Pay app
- Hand-off 05 to Paid
- Hand-off 06 to Margin
- Hand-off 02 · Bid → Contract
Service estimates emailed with no follow-up date, and bids with no recorded outcome.
- Hand-off 04 · Job → Pay app
Extras built on a verbal request, tagged late or never, and missing from the pay app.
- Hand-off 05 · Pay app → Paid
Pay apps past the GC’s cutoff, and retainage parked behind a closeout binder.
- Hand-off 06 · Paid → Margin
Hours coded to general, so fade shows up at closeout instead of mid-job.
Free · two taps · no email
Check one hand-off yourself, right now.
Three questions, from your own records
Of the T&M tags written last quarter, how many carry the super’s signature — and how many reached a pay app?
How many executed change orders are not yet a line on the schedule of values for their job?
How much retainage sits with GCs right now on jobs where the crew has already demobilized — and whose name is on each closeout binder?
If an answer takes digging, note where the record lives. That is where the Review starts.
Free self-check · two taps · no email
Hand-off 3 of 6 · Contract → Delivery
Choose the answer that sounds like your shop.
That was one of six hand-offs where money changes hands, from first inquiry to collected cash. The other five take about three minutes and end in a dated sheet that names where to start.
How it runs
Two weeks, $4,500, one finding you can act on.
Day 0
A 20-minute call
Fit, not yet, or not us. No deck, no payment.
Days 1–14
We read the records
Read-only exports from the systems you already run. Nothing switched off, nothing to install.
Day 14
The findings, in writing
The evidenced gaps, monetary estimates where the records support them, and a prioritized plan naming the next action and the decision it requires.
$2,250 to begin, the balance when the report arrives. The fee does not change with what the Review finds, and the written report is yours to keep.
What we price
Where a dollar figure is possible
Where the records cannot support a figure, the report says so instead of estimating one.
Extras the super asked for on site and the crew built that day — tagged late, never signed, or never tagged at all — and what each one settled for at closeout
Executed change orders that never became a line on the schedule of values, so no pay app ever carried them
Pay apps that missed a GC’s cutoff and rolled a full billing cycle while payroll kept running weekly
Retainage aging behind closeout documents — as-builts, O&M manuals, warranties, the final lien waiver — with no owner and no date
Panel, service and generator upgrades a tech flagged on a closed ticket that never became a written estimate
Labor hours coded to “shop/general” instead of the job and cost code, so fade shows up at closeout instead of mid-job
Before any new software
Large companies are spending heavily on AI. Few can show what it returned.
7%
of 2,145 senior leaders in KPMG’s Q2 2026 survey reported an established return on investment. Revenue thresholds were $50 million or $100 million, depending on the market.
Source: KPMG Global AI Pulse, Q2 2026
Those are companies with their own IT departments and budgets. A smaller business that buys a tool on a hunch has less room for the same mistake.
Leaders with strong visibility into costs were five times as likely to report a return on AI (15% against 3%). The same release adds that without clear ownership, decisions fragment and impact gets harder to track.
Source: KPMG Global AI Pulse, Q2 2026
Who runs it
Small on purpose. Senior on purpose.
Tamara Stepanyan, founder
No client case studies yet — we would rather tell you that than invent one.
Before you call
Questions electrical contractors ask first.
We already run ServiceTitan or BuildOps, and the GC runs Procore. Doesn’t that catch unbilled extras?
Those systems record what gets entered. This leak lives in what never gets entered: the extra directed on site with no tag, the approved change order that never became an SOV line, the upgrade a tech noted on a ticket that nobody quoted. The Review reads the field system against the tag book, the pay apps and the books, and counts the gaps between them. Nothing gets switched off and nobody learns new software. If the records show the hand-off already holds, the report says so. It starts with the free 20-minute call.
Pushing paper on every extra will hurt the GC relationship. Why would we start now?
The Review doesn’t change how the shop deals with any GC; it counts what already happened. A tag the super signs the same afternoon is a smaller conversation than a disputed COR at closeout, argued after everyone’s memory of the hours has gone. What the subcontract requires before extra work starts — a signature, an email, a written directive — is a question for the shop’s construction attorney. We don’t give legal advice.
How do you put a dollar figure on an extra nobody billed?
From the shop’s own numbers: hours from timesheets and daily reports, material from supply-house invoices, and the shop’s own rates and markup, set against what the change order or the closeout settlement actually paid. Public data only shows scale. For example, the Bureau of Labor Statistics put the median electrician wage at $30.38 an hour in May 2025. That is a wage, not a billing rate: in an illustrative two-person, four-hour extra it comes to about $243 of wages before burden, material, overhead or markup. In the report, the shop’s own burdened rate and pricing replace that example.
Retainage is the GC’s call. What does it have to do with an operations audit?
The subcontract sets the amount and the release terms, and some of those terms sit with the GC. The part the shop controls is the closeout binder: as-builts, O&M manuals, the final lien waiver. The Review lists every retainage dollar by job with its closeout status, so each binder gets a name and a date. What a given subcontract allows is a question for the shop’s construction attorney.
Is this business coaching?
No. A coach works with the owner over months on leadership, sales and accountability. The Review reads twelve months of the shop’s own records once — tags, change orders, pay apps, AR and job cost — and puts monetary estimates where supported by the records. What happens after the report is the owner’s call, a coach included.
Our CPA builds the WIP schedule. Isn’t this the same?
No. The WIP schedule shows, after the fact, which jobs are over- or under-billed against percent complete. A summary WIP schedule may not show which under-billings need a closer look at field tags and change approvals — an unsigned tag, an approved change order that never reached the schedule of values, a pay app that missed the cutoff. The Review reads the tag book, the change-order log and the pay apps against the WIP and counts that part job by job. The CPA’s numbers stay the CPA’s.
You’re not electricians. What do you know about our jobs?
We don’t touch the electrical work, the takeoff, the labor units or the code. We read the paper trail where money changes hands: tags, CORs, SOVs, pay apps, lien waivers, AR and job cost. A team with ten-plus years in strategic consulting and business-process automation. Before Lumina, our people built and ran revenue operations inside a Fortune 500 US financial institution. There are no client case studies on this site yet, and we would rather say that than invent one.
What does electrical contractor consulting cost?
It depends on what is being bought, so here it is in print. The first step is a free 20-minute call. The two-week Review is a fixed $4,500 — $2,250 to begin, the balance when the report arrives — and the fee does not change with what the Review finds. Anything built afterwards is scoped and priced separately, in writing, before any work starts.
Related reading
- The long answer for this trade: GC Not Signing T&M Tags or Change Orders?
- How to Invoice a Change Order on a Pay App
- Missed the Pay App Cutoff? What One Month Costs
- Electrical Contractor Consultant Cost: Who Charges What
- Retainage Release for Electrical Subcontractors
- Certified Payroll Holding Up Payment? The Fix
- Why Construction Bids Go Silent (and the Fix)
- Progress Billing vs. Invoice at Completion
- Signs Your Business Needs an Operations Audit
- What an audit like this costs anywhere, and what to demand in writing
In depth
What an electrical contractor business consultant should look at first
The crew signed off. The change never reached the pay application.
Illustrative operating example — not a client case. A foreman records additional work on a time-and-materials tag. The project manager considers it approved, but accounting is still using the previous schedule of values. The owner hears about the difference only when the monthly billing is being assembled.
Trace one change from field tag to documented approval, change log, schedule of values and pay application. Separate work awaiting authorization from authorized work omitted from billing. Do not treat retainage or a disputed amount as immediately collectible cash.
A routine the team can own
Define who closes the field-to-office loop before the billing cutoff. A short exception list can show missing evidence, missing approval and missing billing as different problems. Monitor approved-but-unbilled value and the age of each exception instead of relying on a project manager’s memory.
The Review identifies the hand-off, the evidence available and the next decision. It does not itself implement the change or guarantee recovered revenue. Any later implementation is scoped separately.
How retainage release works, by kind of work
When retainage comes back depends partly on things the shop controls — the closeout documents, the final lien waiver, the punch list sign-off — and can also depend on terms it does not, such as release tied to the GC’s own retainage or to completion of the whole project.
On federal work, FAR 52.232-5 lets the contracting officer retain at most 10 percent of a progress payment from the prime contractor when satisfactory progress has not been made, and FAR 52.232-27(d)(1) lets the prime and the sub negotiate a subcontract term that retains a specified percentage of each progress payment. On state and private work, state statutes may limit how much can be withheld and how quickly a released payment has to reach the sub.
Where an electrical contractor’s money slows down
Each step passes the work to a different person or system. The Review counts what slips at each one.
Bid to award: the follow-up on quotes still open
Award to schedule of values: what the contract actually covers
Field direction to T&M tag: the extra work the super asked for
T&M tag to signed change order, before the next pay application
Pay application to payment, and retainage after substantial completion
Service calls: completed work to invoice
A check on the last job that closed out
Take the last commercial job that closed out and lay three things side by side: every T&M tag or extra the foreman remembers (the tag book, truck photos, the daily reports, or a short conversation with the foreman), the COR log or the change-order emails, and the final schedule of values, the last G702/G703 and the final invoice.
For each extra, mark five things: tagged, signed by the super, COR sent (with the date), change order executed, and the pay app that billed it. A blank between “tagged” and “on a pay app” is labor in payroll with no billing on record, unless the extra was folded into a combined change order or the closeout settlement; if it was, note which one next to it. An empty first column means nothing records extras when they happen, and that is the finding.
Starting the fix costs nothing: the tag books already in the trucks, one rule — no extra starts without a tag the super signs that day — and one weekly log of tag number, job, date, hours, material, COR date, CO date and pay app number. A tag with no pay app number after 30 days goes on the next week’s call list. Row 03 of the free Friday Ledger counts the same thing each week: work done beyond the original scope, and how much of it was in writing. What counts as written approval under a given subcontract is a question for the shop’s construction attorney.
How do you grow an electrical contracting business without growing unbilled extras?
Make the extras routine part of how every new foreman, PM, GC and job starts, and put it in place before the added volume arrives: the tag rule, the open-extras log and the check of executed change orders against the schedule of values, each with a named owner. Growth adds people and GC relationships, and each one is another place where a super’s request on site can turn into payroll hours with no billing behind them. The aim is a hand-off from field direction to pay app that holds without the owner carrying the open extras in their head.
For example, take a shop that grows from four crews to seven. With four crews, one PM saw every job and remembered which extras were still open. With seven crews and two PMs, that memory splits between two people who don’t see each other’s jobs, and the tag that rode in one truck’s door pocket now rides in three. The fix is not more paperwork. It is the same weekly log, with a column naming the PM who owns each tag, read on the same day each week.
Before each step up — another crew, another PM, a new GC — run the check on the last job that closed out, described above. While the company grows, watch the count of tags with no pay app number after 30 days against the number of crews running: if that count climbs faster than the crew count, the routine is not keeping up. What a new GC’s subcontract requires before extra work starts, such as notice, a signature or a written directive, is a question for the shop’s construction attorney. Not legal advice.
New foreman: the tag book in the truck, the rule that no extra starts without a tag the super signs that day, and the name of the PM the tag goes to before the truck leaves the site
New PM: the COR log for their jobs, and a check of every executed change order against the schedule of values before each pay app
New GC: the subcontract’s change-order and notice terms read before the first extra, and that GC’s pay app cutoff date on the calendar
New job: a job number and cost codes set up before the first hour is worked, so hours on an extra are not coded to shop/general
AI for electrical contractors: what to automate after the count
Tools come after the numbers, and only where a leak justifies them. A person still decides every price and every message.
A T&M tag that cannot close without a signed change-order request attached
A weekly match of field tags against change orders and the next pay application
A bid log with a follow-up date and a recorded outcome on every quote
AI-assisted reading of foreman notes and photos into a draft change-order description, priced and approved by the project manager
What to track weekly: the numbers that show whether the fixes hold
We do not promise a result. These are the measures the findings are written in, so the shop can track them after the Review.
T&M tags converted to signed change orders, and the days each took
Change orders billed on the next pay application
Bid follow-up rate and hit rate, by estimator
Retainage outstanding past substantial completion
Days from pay-application submission to payment
Sources
Statistics of U.S. Businesses 2022: firms, employment and receipts by enterprise receipts size, 6-digit NAICS · U.S. Census Bureau, 2025
Occupational Outlook Handbook: Electricians · U.S. Bureau of Labor Statistics, 2026
FAR 52.232-5, Payments under Fixed-Price Construction Contracts · Acquisition.gov, 2026
FAR 52.232-27, Prompt Payment for Construction Contracts · Acquisition.gov, 2026
The next step
Tell us what isn’t getting followed up. We’ll tell you if we can help.
Use the first call to identify the gap in one project’s paperwork. Contract interpretation, lien rights and legal collection decisions remain with counsel.
- Send the form beside this. A person reads it, not a bot or a ticket queue. We call you back the same business day.